Some of Our Achievements

Dubai Region

 Dubai festival city (Complete Brand-Rex Solution) - This is Al Futtaim Project taken by Al-Futtaim Technologies and is sub-contracted to us. It consists of the installation of complete Brand-Rex solution for over 2,500 UTP Points and 40 Kilometers of the Fiber link. 
CCTV and Access control systems sub-contracted to us through Singapore Technologies. (720 cameras & card reader – 108, door contact – 72nos, request to exit buttons – 72nos, door strike – 72nos, digital lock – 127nos, wireless standard transponder – 50nos)

Business Bay 11 Tower (Complete CCTV & Access Control Systems) – This is Honeywell project contains CCTV & Access control systems. It consists of cameras – 122, card reader – 260, magnetic lock – 350, door contact – 700, alarm sounder – 40nos. Supply & installation of GI containment like Trunking, Piping, and Tray etc.

Tyco (SubCom) Outside plant cabling – This is Tyco (SubCom) project taken by Digital Link and is sub-contracted to us. Pulling of marine cable (TATA Gulf) from the Customer Premises to Etisalat Main exchange – 3 links approximately 21 Km each. 21 Km of subducts is pulled by winch machine.

Dubai World Trade Centre (DWTC) (Complete Nexans Solution) – This Project took by Al Futtaim Technologies and is sub-contracted to us. It consists of the installation of complete Nexans solution for over 7500 UTP points and fiber link of 10 km.

Dubai International Airport Expansion – T3 (Fiber - Alcatel solution) – This is a Thales project taken by Omnix International and is sub-contracted to us. It consists of the installation of fiber cables for over 100 km.

International Modern Hospital – Bur Dubai: (Brand-Rex Solution) – Supply & installation of over 600 UTP points in a structured cabling system.

NMC Hospital Al Qusais Dubai.: (Brand-Rex Solution) Supply & installation of over 650 UTP points in a structured cabling system.

Nissan showroom, Sharjah – IBM cat7 installation

 

Abu Dhabi Region

Etisalat : ( FTTH Cable pulling in Mussafa Region ) FTTH cable pulling & termination of single mode fiber optic connectors

Etihad airways: (Leoni Kerpen with certification) Installation of over 4000 ftp cat-7 cables in the whole campus, along with fiber links (om2, om3) – 20kms, multi-pair indoor & outdoor cables. Supply & installation of GI containment like Trunking, piping, tray etc.

Mafraq Hospital Abu Dhabi: (Molex Solution with certification) Installation of over 1000 UTP points in the whole hospital, along with fiber link from 15 IDF to MDF in new VIP bldg. The length of total fiber links was accumulated to be over 10 km

 

Fujairah Region

This is Alcatel project taken by digital link and is sub-contracted to us. Pulling of marine cable from the Etisalat beach manhole (came from Kenya and India) to Etisalat main exchange – 2 links approximately 4.5 km fiber with sub-duct through the Etisalat manhole. Cable pulled by winch machine.

 

Al-Ain Region

Tawam Hospital: (Alcatel solution with certification) Most of the work done as a sub-contractor through DPS. 
VIP Building, Tawam Hospital, Al Ain - Structured cabling – UTP: 260 pts. Fibre link from VIP Building to Poly Clinic Building, Admin & Main Hospital bldg. New emergency block. --140 data points. Fiber link main hospital MDF to ER. Including the active part of the networking. Configured separate VLANs for ER, along with installation and configuration of the ER monitoring system. Royal suites -- 30 data points. Fiber link from main hospital building MDF to royal suites IDF. New labor & delivery ward. The network infrastructure of 45 data points. Active networking: layer 2 switches were connected to existing layer 3 switches (cat 6509) Fiber link from main hospital bldg. To l & d. Alcatel cabling systems cat5e installation for more than 300 dual and single sockets and more than 12 fiber backbones.

Jebel Hafeet Hotel, Al-Ain. Alcatel cabling systems cat5e installation for 350 dual and single sockets and 14 fiber backbones
Our Achievements

 

Ministry Projects

Ministry of communication – Abu Dhabi & Dubai. Alcatel cabling systems cat 6 installations for 100 dual sockets and two fiber backbones and multipair. Al Bateen airbase. Lucent installation for 100 dual sockets.


• Al Ain Tawam hospital – Al Ain.
• Al Ain hospital.
• British consulate.
• Al Wasl club – Dubai.
• Khalifa hospital – Ajman.

 

Al Futtaim Group of Companies – Projects

• Al Futtaim electronics – Panasonic PABX – Main authorized installer.
• Al Futtaim engineering – Toyota service Centre – Rashidiya.
• World food program.
• Ace Hardware.

 

Al Rostamani Group of Companies – Projects

• Nissan service Centre – Dubai
• Nissan service Centre – Abu Dhabi
• Nissan service centre – Ajman.
• Nissan service centre – Sharjah.
• Nissan service Centre – Ras Al Karma.
• Nissan service Centre – U.A.E.
• National bank of Dubai – U.A.E.

 

Electrical Installations

Abu Dhabi Islamic bank emirate bldg. Sheikh Zayed Rd.
Complete installation of electrical system. As a sub-contractor for honest technical services

Dubai media city.
Complete electrical cabling, lighting & other electrical accessories installation as a sub-contractor for eta.

Fire alarm: We conduct the projects as sub-contractor for Juma Al Majid.

Healthcare city fire alarm system installation. (in progress) Through arctic company as sub-contractor.

World trade center apartments. Fire alarm system installation. Implemented the project through Juma Al Majid as sub-contractor.

Royal le meridian hotel Through BMTC as sub-contractor as sub-contractor.

 

CCTV & Access Control Systems Installations

Dubai festival city
Installation of CCTV camera – 950 no’s through Singapore technologies

Nad al Sheba CCTV installation.
Installation through al Gurg Electronics as sub-contractor.

Nissan showroom – sheik Zayed road Installation of a security system for Al Rostamani communications as a sub-contractor.

Wafi city - Installation of CCTV camera through Honeywell L.L.C.

Multimedia projector solution:

U.A.E schools – multimedia projector solution to run virtual classes.